A Higher Degree of

quality

Ready to Team Up for a Win

Healthcare and Education projects require a high level of collaboration with the architect, school design team, fire department, school sports departments, healthcare facility managers, and administrators, along with other key stakeholders. The Gaskins design team has achieved great success in education and healthcare projects. Our high level of professionalism and precision lend order and set a high bar for quality.

Example
Projects

WellStar East Cobb

The project included a four-story, 162,000 square foot building and a 721-space parking lot on 23.89 acres. Surveying services included staking for grading, site utilities, curb, stake and as-built the underground detention pond, and as-built the site utilities. Gaskins also measured the finish floor elevation twice a week to monitor for settling.

Mt Paran

Stadium and Field

Gaskins designed the civil improvements for the 4,000-seat stadium and field, which included parking, stormwater management, and access for this private school located in Marietta, GA.

Ross Memorial

The project was for site improvements associated with a 36,000 square foot medical building expansion on 6.2-acres. Site improvements included the addition of 50,000 square feet of parking using a pervious paver system combined with an underground stormwater detention system. The design included land planning, erosion control, utilities, two commercial entrances, existing road widening, and grading.

Whitefield Academy

Gaskins has worked with Whitefield Academy for several expansions. The latest projects included modifications to the football stadium, including construction of a 1,000-seat stadium, an addition of a press box and concession area, reconfiguration of parking and landscape, and sidewalk additions to enhance the pedestrian flow around the stadium.

Services included ALTA boundary survey, topographic survey, site civil engineering, erosion control design, grading and drainage design, utility design, field construction coordination, construction staking, and final as-builts.

Riverstone Church

The project was developed as a Church and Community Center for the Riverstone Church within the Kennesaw area. The site included a 42,000 square foot lot with 539 total parking spaces. The parking includes cross-access coordination and flow design between two designed access points from two main roads.

 

Gaskins conducted boundary and topographic verification and compilation by our Surveying department. The commercial site development included land planning design and site design coordination with JEA Architects, as well as coordination with the existing congregation and various committees of Riverstone Church. The design included coordination with city roads entrance designs, full utility design, hydrology and drainage system design, coordination with on-site streams, parking and emergency access study, and NPDES Complaint erosion control design.

Projects

WellStar East Cobb

The project included a four-story, 162,000 s.f .building and a 721-space parking lot on 23.89 acres. Surveying services included staking for grading, site utilities, curb, stake and as-built the underground detention pond, and as-built the site utilities. Gaskins also measured the finish floor elevation twice a week to monitor for settling.

Mt Paran

Stadium and Field

Gaskins designed the civil improvements for the 4,000-seat stadium and field, which included parking, stormwater management, and access to this private school located in Marietta, GA.

Ross Memorial

The project was for site improvements associated with a 36,000 square foot medical building expansion on 6.2-acres. Site improvements included the addition of 50,000 square feet of parking using a pervious paver system combined with an underground stormwater detention system. The design included land planning, erosion control, utilities, two commercial entrances, existing road widening, and grading.

Whitefield Academy

Gaskins has worked with Whitefield Academy for several expansions. The latest projects included modifications to the football stadium, including construction of a 1,000-seat stadium, an addition of a press box and concession area, reconfiguration of parking and landscape, and sidewalk additions to enhance the pedestrian flow around the stadium.
Services included ALTA boundary survey, topographic survey, site civil engineering, erosion control design, grading and drainage design, utility design, field construction coordination, construction staking, and final as-builts.

Riverstone Church

The project was developed as a Church and Community Center for the Riverstone Church within the Kennesaw area. The site included a 42,000 square foot lot with 539 total parking spaces. The parking includes cross-access coordination and flow design between two designed access points from two main roads.

 

Gaskins conducted boundary and Topographic verification and compilation by our Surveying department. The commercial site development included land planning design and site design coordination with JEA Architects, as well as coordination with the existing congregation and various committees of Riverstone Church. The design included coordination with city roads entrance designs, full utility design, hydrology, and drainage system design, coordination with on-site streams, parking and emergency access study, and NPDES compliant erosion control design.